Default Shifting a concrete pad?

How about just pushing one over a few inches?

We're having a new course put in and the city workers put #5's concrete pad right in front of tree. It needs to be shifted over about 16 inches. Could a Bobcat or Backhoe just push it?

Here's the catch, they poured 2 inches of gravel into the form, then added 4 inches of concrete. Think they could dig a small 16 inch area where it needs to slide to, then push it with the tractor or would this bust it up? It's only a little over a foot. I've seen the moving teepad thread but their's had no gravel under it so I'm thinking this might be a more difficult task.

Any advice? See horrible drawing below for an idea on what I'm asking about. We wanted it through the trees, not the tree directly in front.

Before anyone suggests adding 16 inches of concrete to it, we're not allowed to manipulate the size of any teepad, they said, this was made known to us from day one and there's no exceptions. That's out of the question. Also, we can't cut the tree down either.



Frickin city workers and their rush jobs.

Sponsored Links
Reply With Quote
  #2  
Old 07-27-2010, 01:09 PM
Elderberen's Avatar
Elderberen Elderberen is offline
Birdie Member
 
Join Date: May 2010
Years Playing: 11.2
Courses Played: 32
Posts: 307
Niced 0 Times in 0 Posts
Default

you cane live with it or just threw in to the tree tell it dies and the city cuts it down. but you will not be moving that pad there well it will brake up if not down right. but i am not a concert worker so.
Reply With Quote
  #3  
Old 07-27-2010, 01:18 PM
Jody Mitchell's Avatar
Jody Mitchell Jody Mitchell is offline
Eagle Member
 
Join Date: Sep 2009
Location: Columbus, Ga.
Years Playing: 15
Courses Played: 21
Posts: 543
Niced 0 Times in 0 Posts
Default

This tree has huge girth. It's a giant pine. About 2 ft. thick.

When the heat dies down and the city guys are out there again, I'll ask them. They might have a forklift or a fork accessory for a bobcat that can get under it, pick it up and move it over.

I dunno, it's their fault so maybe they can fix it.
Reply With Quote
  #4  
Old 07-27-2010, 01:28 PM
Thumber's Avatar
Thumber Thumber is offline
Double Eagle Member
 
Join Date: Jun 2010
Years Playing: 11.5
Posts: 1,693
Niced 1 Time in 1 Post
Default

Quote:
Originally Posted by Jody Mitchell View Post
This tree has huge girth. It's a giant pine. About 2 ft. thick.

When the heat dies down and the city guys are out there again, I'll ask them. They might have a forklift or a fork accessory for a bobcat that can get under it, pick it up and move it over.

I dunno, it's their fault so maybe they can fix it.
Can't they make an exception, because its their fault in the first place, and just form a 16 inch wide strip on the edge of the original pad and pour more concrete? Unless its rebarred, its gonna break into pieces moving it and you are going to end up re-pouring the pad anyway
Reply With Quote
  #5  
Old 07-27-2010, 01:29 PM
CaptainAnhyzer's Avatar
CaptainAnhyzer CaptainAnhyzer is offline
* Ace Member *
 
Join Date: Nov 2008
Location: Albany, NY
Years Playing: 33.6
Courses Played: 95
Throwing Style: RHBH
Posts: 3,434
Niced 231 Times in 102 Posts
Default

Looks like a disc golfer wasn't there to supervise.......... definitely not friendly to the lefty BH.
Reply With Quote
  #6  
Old 07-27-2010, 01:30 PM
kenjiac's Avatar
kenjiac kenjiac is offline
Eagle Member
 
Join Date: Mar 2008
Location: Colonie NY
Years Playing: 11.4
Courses Played: 99
Throwing Style: RHBH
Posts: 950
Niced 109 Times in 70 Posts
Default

We have moved concrete tees @ hyzer creek. They were poured in the parking lot and trailer out to thier locations. We used comealongs to move them in place after coming off the trailer. Can you pry up the pad? Or dig out under the ends 6" in. If so use a tow strap wrap it around the pad and use a comealong to pull it over the 16". I would dig out the side its moving to and put down the gravel base before you pull it.

Last edited by kenjiac; 07-27-2010 at 01:33 PM.
Reply With Quote
  #7  
Old 07-27-2010, 02:26 PM
Jody Mitchell's Avatar
Jody Mitchell Jody Mitchell is offline
Eagle Member
 
Join Date: Sep 2009
Location: Columbus, Ga.
Years Playing: 15
Courses Played: 21
Posts: 543
Niced 0 Times in 0 Posts
Default

Quote:
Originally Posted by CaptainAnhyzer View Post
Looks like a disc golfer wasn't there to supervise.......... definitely not friendly to the lefty BH.
Long story, short. We were asked to leave once we walked them through the park pointing out all 18 tee locations. They got 17 out of 18 right for the first course in this city. Not our fault, theirs, their boss was stern on having us out of their way that day. Once they found all the pad markers.

As far as it not being friendly to a LHBH, that's the reason we're wanting it shifted over, the trees are plenty far enough away to avoid injury though, it's just that the pad is not lined up with this hole's fairway. It's not in it's intended location. I didn't want to get into why it was poured this way, but how to fix it. Again, it's not mine nor any of the design team's fault, it was out of our hands.

Here's a pic of the hole and fairway.



The orange flag is now the front/right corner of the pad, about 8 feet back from the trees. The fairway for this hole is directly through the 2 trees and the basket is way down on the far right hand side by the bush at the end.

The orange flag is supposed to be the front center, but like I said, that's not how it was poured.

I think I'm just going to convince them to add 16 more inches of concrete to the right side of it, if they won't do it, maybe they can just let the club do it.
Reply With Quote
  #8  
Old 07-27-2010, 02:31 PM
CaptainAnhyzer's Avatar
CaptainAnhyzer CaptainAnhyzer is offline
* Ace Member *
 
Join Date: Nov 2008
Location: Albany, NY
Years Playing: 33.6
Courses Played: 95
Throwing Style: RHBH
Posts: 3,434
Niced 231 Times in 102 Posts
Default

Looks like you'll need to learn to drive RH now.......... a flick-roller might work too.
Reply With Quote
  #9  
Old 07-27-2010, 02:44 PM
Jody Mitchell's Avatar
Jody Mitchell Jody Mitchell is offline
Eagle Member
 
Join Date: Sep 2009
Location: Columbus, Ga.
Years Playing: 15
Courses Played: 21
Posts: 543
Niced 0 Times in 0 Posts
Default

Even though I'm right-handed, I don't think courses should be biased towards right-handers.

It was just ridiculous for them to place it like that. I shouldn't be surprised though, it was city workers work but maybe they'll let us fix it if they don't want to.

I'm waiting on a call now from their supervisor to get the final verdict.
Reply With Quote
 

  #10  
Old 07-27-2010, 02:47 PM
Jody Mitchell's Avatar
Jody Mitchell Jody Mitchell is offline
Eagle Member
 
Join Date: Sep 2009
Location: Columbus, Ga.
Years Playing: 15
Courses Played: 21
Posts: 543
Niced 0 Times in 0 Posts
Default

Quote:
Originally Posted by kenjiac View Post
We have moved concrete tees @ hyzer creek. They were poured in the parking lot and trailer out to thier locations. We used comealongs to move them in place after coming off the trailer. Can you pry up the pad? Or dig out under the ends 6" in. If so use a tow strap wrap it around the pad and use a comealong to pull it over the 16". I would dig out the side its moving to and put down the gravel base before you pull it.
This is exactly what a friend suggested. He's got plenty of experience in this type of stuff so maybe that will work if they'll do it or let us do it.

Here's the options;

1 - Suck it up and leave it as is. (it's not horrible, it's just not where it was originally intended)

2 - Somehow shift it over

3 - Pour 16 inches on the right side

4 - Remove the tree on the left (More than likely a BIG NO!!!)

5 - Learn to enjoy this difficult pad position.
Reply With Quote
Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Non-concrete pad companies joshisaking Course Development 11 11-21-2018 01:05 PM
Help me understand shifting weight from behind Discusted Technique & Strategy 7 07-20-2018 01:05 AM
Trouble shifting weight ALT-J Technique & Strategy 2 07-14-2017 07:54 PM
tee pad size and pad/pin ?'s neilransch Course Design 31 05-12-2013 12:01 PM
Concrete Pad Moving 1978 Disc Golf Courses 13 05-23-2010 09:41 PM


All times are GMT -4. The time now is 10:00 PM.


Powered by vBulletin® Version 3.8.10
Copyright ©2000 - 2018, vBulletin Solutions, Inc.